Last updated November 17, 2026
New windows and doors improve comfort, cut energy bills and add long-term value to your home. Sightline Windows & Doors Boulder City pairs proven product lines with a local vetted installing partner for lasting performance - and a price put in writing.
Choose your installer
The unit is half the job - the install is the other half. Background-checked local installers measure, set, seal and insulate every opening, and they know the lines we quote inside and out.
Select the right products
Compare styles, materials and glass packages side by side until the fit is right for your rooms, your budget and your goals. The product-line comparison below is the place to start.
Prepare your home for install
Before install day we walk you through a short checklist - furniture pulled back, treatments down, a clear path to each opening - so install day is watch-it-happen, not scramble.
Compare the Lines We Quote
Every project is priced on the same lines, side by side - the price indicators below are relative, and your consultant shows exact numbers on your actual openings.
PGTThe line homeowners arrive naming - the most impact certifications in the industry$$$
- More impact certifications than any other line we quote
- WinGuard, EnergyVue and ClassicVue Max systems built for every wind zone
- 99% on-time delivery keeps your install date on the calendar
CGIThe heavyweight impact line$$$$$
- Large-missile impact ratings for the strictest wind zones
- Architectural-grade aluminum with commercial-depth frames
- The line we quote when protection is the whole point
CWSThe value pick$$
- Vinyl systems built to strict wind codes
- Strong energy packages at the friendliest price point
- The smart start for whole-home replacements on a budget
ESWSlim lines, big glass$$$$
- Narrow-sightline aluminum for modern elevations
- Oversized openings and floor-to-ceiling glass
- Impact-rated without the bunker look
ECOThe aluminum impact workhorse$$$
- Factory-built aluminum impact systems
- A strong price-to-protection ratio for coastal homes
- Proven lines with short lead times
How Long Does Door Installation Take? Timelines and What to Expect
A standard pre-hung exterior door swap takes 2 – 4 hours of labor. The surrounding process – measure, order, deliver, prep, install, inspect – typically runs 3 – 6 weeks. That gap is the part most quotes never mention, and it’s the part that actually moves your calendar. A written estimate that lists only “install: 3 hours” tells you nothing about the three weeks your front entry sits in a fabrication queue or the half-day a rotted sill adds once the old door comes out. This guide breaks the full timeline into its five real phases so Boulder City homeowners can plan around the whole job, not just the morning a crew shows up.
Quick Answer

Door installation takes 2 – 4 hours of active labor for a stock pre-hung exterior door, but the full project from signed quote to finished job usually runs 3 – 6 weeks. Custom-sized, impact-rated, and fiberglass composite doors push that to 5 – 9 weeks because of fabrication and freight. The two variables that decide your actual date are order lead time and the condition of the rough opening once the old door is removed.
Before
AfterTable of Contents
- The Five Phases of a Door Installation
- How Long Each Phase Really Takes
- Lead Times by Door Type
- Why Rough Opening Condition Adds a Day
- What Happens on Installation Day
- Three Boulder City Conditions That Delay Same-Day Completion
- What a Photo-Documented Job Close Looks Like
- How to Build a Realistic Calendar
The Five Phases of a Door Installation

Every door replacement moves through five distinct phases, and each one has its own clock. Confusing them is how homeowners end up frustrated: they hear “we can install it in an afternoon” and assume the door will be in by next weekend. In our experience, quoting the labor phase without the four phases around it is the most common way a written estimate misleads.
1. Measured survey. A technician measures the rough opening, the finished opening, the wall thickness, the swing clearance, and the threshold height. The survey document is the basis for the order and the quote. It should be one document, not two.
2. Order and fabrication lead time. Stock sizes ship from distribution. Custom sizes, impact-rated assemblies, and composite doors are built to order. This is where most of the calendar lives.
3. Delivery and inspection. The door arrives, gets checked against the survey for size, handing, glazing, and finish, and is staged. A wrong-handed door caught here saves a wasted install day.
4. Installation day. Removal, rough opening prep, setting, flashing, insulation, trim, and hardware. This is the 2 – 4 hour labor phase – and it can stretch.
5. Final documentation. Photo record, operation test, warranty paperwork, and walkthrough. Twenty to forty minutes when done right.
For the survey-to-install workflow at the door installation in Boulder City page, the measured survey and the written quote are the same document by design. That’s not a slogan – it’s the only way phase one and the price stay honest, because the order is placed against that exact survey.
How Long Each Phase Really Takes
Here’s a realistic breakdown of durations from our engagements. Ranges assume a typical single exterior door; interior doors run faster, multi-door orders run longer.
- Measured survey: 45 – 90 minutes on site, written quote delivered within a few business days.
- Quote review and sign-off: your timeline, typically 1 – 7 days as you compare estimates.
- Order and fabrication: 1 – 2 weeks for stock, 3 – 7 weeks for custom, impact-rated, or composite (details below).
- Delivery and inspection: same week as installation, 1 – 2 days lead.
- Installation day: 2 – 4 hours stock; 4 – 8 hours when rough opening work is needed.
- Final documentation: 20 – 40 minutes, included on every job.
The totals: 3 – 6 weeks for a stock door, 5 – 9 weeks for custom or impact-rated. The labor hours are a rounding error next to the order clock. This is why a quote that says “install in one afternoon” is technically true and practically misleading. The number that matters is the date on the order confirmation.
If you’re weighing one door against several, the same phases apply to a full replacement – the window replacement in Boulder City timeline runs on parallel logic, with the same survey-first discipline.
Lead Times by Door Type

Lead time is the phase that most homeowners underestimate. It varies more by product than by installer. Here’s how the categories break down.
| Door Type | Typical Lead Time | Why |
|---|---|---|
| Stock pre-hung (steel or fiberglass) | 1 – 2 weeks | Ships from distribution in standard sizes |
| Custom-sized pre-hung | 3 – 5 weeks | Built to measured opening, non-standard dimensions |
| Impact-rated steel | 4 – 7 weeks | Assembly, glazing, and impact certification per unit |
| Fiberglass composite | 3 – 6 weeks | Molded skin, finish, and hardware configuration |
| Patio / sliding glass | 3 – 6 weeks | Frame assembly and glazing; larger units freight slower |
Impact-rated doors sit at the long end because each unit is assembled and certified as a system, not pulled off a rack. In Boulder City, where wind-driven dust and summer heat are hard on exterior doors, many homeowners choose impact-rated glazing on patio doors – budget the longer lead time into your plan. Lines like ES Windows and Therma-Tru specify by performance tier, so the lead time ties directly to the spec you chose, not to a salesperson’s optimism.
Reading a lead time correctly
- Ask for the lead time in writing with the quote, not verbally.
- Confirm the lead time starts at order confirmation, not at signed quote.
- Add 3 – 5 business days for delivery to the site and inspection.
- Add a buffer for the install day itself in case rough opening work appears.
That’s the honest calendar. A written estimate should show it. If a quote gives you one number for the whole job with no phase breakdown, ask for the breakdown – the answer tells you whether the person quoting understands their own supply chain.
Why Rough Opening Condition Adds a Day
The rough opening is the framed hole in the wall the door sits in. On a new build it’s square and plumb. On a 20-year-old house, it may not be. When the old door comes out, the technician sees what the survey couldn’t: rot at the sill or jamb, out-of-square framing, water damage behind the trim, or a previous install that was shimmed into a bad wall.
Any of these can add a half-day to a full day to the install phase. Rot repair, reframing, and new flashing take time, and they can’t be scoped until the old door is gone. This is the single most important thing to understand about door installation timelines: the install day is the only phase with real uncertainty baked in, and the only way to reduce that uncertainty is a thorough measured survey and a written scope that anticipates it.
- Rot at the sill or jamb: half-day to a day for repair and new flashing. Common on homes where the door faces prevailing weather.
- Out-of-square framing: a few hours to reframe and re-shim; sometimes more if the wall itself is out of plumb.
- Non-standard opening: adds order time (custom door) and install time (fitting), so it hits two phases.
- Old hardware left in the wall: deadbolts, strikes, and anchors from a previous door need patching and relocating.
A written scope that names these possibilities before work starts is the difference between a fixed price and a change order. Under the Haven Standard’s “No surprises” clause, the price you sign is the price you pay – which means the survey has to be thorough enough to catch what it can. Our technicians have up to 14 years of experience reading these openings, and the survey reflects it.
What Happens on Installation Day

Installation day is the phase homeowners picture, so here’s the actual sequence. A stock exterior door is a 2 – 4 hour job; a job with rough opening work runs 4 – 8 hours. The crew arrives with the door, the survey, and the hardware.
- Protect the interior. Floor coverings and doorway protection go down before the old door comes out.
- Remove the old door and trim. The old unit comes out and the opening is exposed for inspection.
- Inspect and prep the rough opening. Check for rot, square, and plumb. Repair if needed (this is where the half-day lives).
- Set the new door. The unit is shimmed, leveled, and plumbed in the opening.
- Flash and insulate. Water management and air sealing around the frame, critical in Boulder City’s dust and heat.
- Trim, hardware, and finish. Casing, threshold, lockset, and weatherstripping.
- Operation test. The door opens, closes, latches, and seals correctly through its full swing.
Every step is photographed. The documented photo record is standard on every job under the Haven Standard, not an upsell – it’s the evidence that the flash was done right and the rough opening was sound when the wall closed up behind the trim.
Three Boulder City Conditions That Delay Same-Day Completion
Boulder City’s climate and soil do specific things to door installs. Three conditions come up often enough that we plan around them.
1. Extreme heat expansion gaps
Summer temperatures here push exterior door slabs and frames through real thermal expansion. A door fitted in the cool of morning can drag on the threshold by afternoon if the gap tolerances weren’t set for heat. The fix is measured gap and clearance – a proper reveal at install, not a door that binds by July. Fitting a door in Boulder City means fitting it for the high end of the temperature range, not the ambient temperature of the install day.
2. Caliche subsoil settling
Caliche is the calcium-carbonate hardpan common across the region. It drains poorly and shifts with moisture cycles, which can throw a threshold out of level over the years. When a threshold is out of level at install, the door can be set true only by addressing the base – that’s a half-day of work that’s invisible in a labor-only quote. On slab entries, this is one of the most common surprises.
3. Dust infiltration in threshold hardware
Wind-driven dust works into threshold hardware, multi-point locks, and sliding door tracks. Doors that aren’t specified with dust-tolerant hardware and seals need rework sooner. It’s also a reason to check the seal and hardware spec at the survey stage – a door that seals against dust is a different product than a door that seals against wind.
If you’ve watched a Boulder City door bind in summer or stick after a monsoon, those are the three culprits in order. None of them is a mystery; each is fixable when it’s planned into the install rather than discovered after.
What a Photo-Documented Job Close Looks Like

Job close is the phase nobody talks about, and it’s the one that matters 18 months later. A proper close includes:
- Photo record of the opening before, during, and after install: rough opening condition, flashing detail, insulation, set and shim, finished trim, and operation.
- Operation test written down: the door opens, closes, latches, and seals through its full swing.
- The measured survey and final invoice as the same document: the price on the invoice matches the price quoted before work started.
- Written warranty paperwork under the 365-Day Done Right Promise: if it’s not done right, we make it right – in writing, not verbally.
- Hardware and finisher touch-up record: lockset, threshold, and any paint or finish notes.
Why does this matter? Because if a warranty claim arises later – a leak at the threshold, a binding door, a delaminated finish – the photo record is the evidence of what was installed and how. Without it, the claim becomes one person’s memory against another’s. With it, the conversation is short. That’s the whole point of documentation, and it’s why it’s built into every job rather than offered as an add-on.
The same discipline runs through a window installation in Boulder City, where the photo record protects the flashing and seal just as it does around a door.
How to Build a Realistic Calendar
Here’s how to lay out a real door installation timeline before you sign anything.
- Book the measured survey. Everything downstream depends on it. Ask for the survey document in writing.
- Review the written quote. Confirm it names the product line, size, handing, glazing, and hardware, and that the price won’t change once work starts.
- Ask for the lead time in writing. Get the number from the order confirmation, not the sales call.
- Add delivery and inspection days. The door arrives, gets checked, and is staged before install day.
- Book install day with a rough-opening buffer. Assume the possibility of a half-day of prep work until the old door is gone.
- Plan for job close. Twenty to forty minutes for the walkthrough, operation test, and paperwork.
Total: 3 – 6 weeks stock, 5 – 9 weeks custom or impact-rated. Put those numbers on the calendar and tell the family. The one thing to avoid is narrowing the timeline to the labor day alone, because it doesn’t reflect what’s actually happening to your entryway for the weeks around it.
If you’re also weighing a full opening replacement – door plus sidelites or a patio slider – the Sightline Windows & Doors Boulder City home team can scope the whole opening on one survey so the phases line up.
Common Mistakes to Avoid

- Treating the labor day as the whole job. Three hours of install doesn’t mean three hours to finished door. Budget the full 3 – 6 week window.
- Accepting a verbal lead time. A verbal “about two weeks” is meaningless when the order confirmation says five. Get it in writing, tied to the product line.
- Not asking whether the price is fixed. If rough opening rot can trigger a change order, that risk lives with you. A fixed written price with a thorough survey moves it to the installer.
- Skipping the measured survey document. If the measurement and the quote aren’t the same document, you’re exposed. That’s the founding principle behind our written price before any work starts.
- Choosing by price alone without reading the spec. A quote that names no product line can’t be compared to one that names ES Windows or ECO Window Systems. Same price, different product.
- Fitting a Boulder City door without heat and dust tolerance in mind. A door that binds in July or sticks after a monsoon was fitted to the wrong temperature and seal spec.
- Not keeping the job-close photo record. If a claim arises later, that record is your evidence. File it with the warranty.
When to Call a Professional
Some door work is a genuine installer’s job, not a weekend project. If the opening is out of square, the sill shows rot, the wall is stucco or brick with complex flashing, the door is impact-rated or custom-sized, or the threshold sits on a slab that’s out of level, call a professional. Rough opening repair, flashing, and impact-rated product installation require the right tools and the right insurance. A door that leaks at the threshold or binds in the heat is a bigger problem than the install ever was. Sightline Windows & Doors Boulder City offers free estimates in Boulder City – call (833) 847-4018. Bring a competitor’s written estimate and we’ll review it at no charge as a free second opinion.
Frequently Asked Questions

Door installation takes 2 – 4 hours of active labor for a stock pre-hung exterior door, with the full project from quote to finished job typically running 3 – 6 weeks when order and fabrication time is included. Custom-sized, impact-rated, and composite doors push the total to 5 – 9 weeks. Call (833) 847-4018 for a written timeline on your specific door – estimates are free.
Because the labor phase is only one of five phases: measured survey, order and fabrication, delivery and inspection, installation, and final documentation. The order and fabrication phase is where most of the calendar lives – stock doors ship in 1 – 2 weeks, custom and impact-rated doors take 3 – 7 weeks. The install is the short part.
Yes for the installation phase only – a stock door is often done in one morning to early afternoon. But one-day completion isn’t the same as a one-day project. Reserve a full day on the calendar in case rough opening work appears, and treat the weeks before as part of the job. Call (833) 847-4018 to schedule your free estimate.
Door installation in Boulder City typically ranges by product: a stock pre-hung exterior door install runs roughly $400 – $900 in labor, custom and impact-rated installs run higher, and the door itself ranges from about $400 for a stock steel unit to several thousand for impact-rated glazed doors. We give you a written price before any work starts; call (833) 847-4018 for an exact quote.
If rot, out-of-square framing, or an out-of-level threshold turns up, expect a half-day to a full day added to the install phase for repair and new flashing. This is why the measured survey has to be thorough and the written scope has to anticipate it – so the price you signed is the price you pay, not a change order. Call (833) 847-4018 for a free estimate.
Whether a permit is required depends on the scope – like-for-like replacements often don’t require one, while structural changes or new openings can. We confirm what your job needs before work starts and tell you in writing. Call (833) 847-4018 to schedule your free estimate and ask about permits for your specific opening.
The Bottom Line
The installation itself is rarely the long part. The measured survey, the order lead time, and the rough opening condition decide your real calendar, and any quote that only describes the labor hours is hiding the phases that actually disrupt your schedule. Budget 3 – 6 weeks for stock doors and 5 – 9 weeks for custom or impact-rated units. Expect a half-day of potential rough opening work until the old door is gone. Ask for the survey, the lead time, and the fixed price in writing – and keep the photo record at job close, because that’s what protects you 18 months from now. The door swap is hours; the project is weeks. Plan for both.
Contact

Ready to get a written timeline and a fixed price for your door? Sightline Windows & Doors Boulder City gives you a measured survey you keep, a written price before any work starts, background-checked technicians with license numbers on the page, and the 365-Day Done Right Promise on every job. Call (833) 847-4018 for a free estimate – calls are answered by a live person, 24/7. We install across Boulder City drawing from eight manufacturer lines specified by what the opening requires, including ES Windows and ECO Window Systems. Get the full timeline in writing before anything is ordered.
Written by the team at Sightline Windows & Doors Boulder City.
Six Reasons Homeowners Choose Sightline Windows & Doors Boulder City
Laminated glass and reinforced frames hold up to wind-driven rain, hail and flying debris, so your openings stay sealed when the weather turns.
Low-E insulated impact glass from our manufacturer lines commonly cuts monthly cooling bills 20-30%.
Laminated impact glass shuts out up to 40% of outside noise - traffic, neighbors, weather.
Monitoring services run $30-90 a month. Laminated impact glass resists forced entry around the clock, with no subscription.
Tighter seals and insulated glass even out hot and cold rooms and stop the drafts at the frame.
A full impact package upgrades curb appeal, buyer confidence and appraised value in one project.
Other Sightline Windows & Doors Boulder City Services